Knox Butte

The project consisted of 2,200 feet of road widening, 4,000 feet of road pioneering including tree and stump removal, laying road fabric, putting in base rock and 3/4 minus for final grade, turnouts were installed every 400 feet, and culverts were installed where it was necessary.