Silver Stem
The Silver Stem forest improvement project at Silver Falls State Park.
The Silver Stem forest improvement project at Silver Falls State Park.
The project consisted of 2,200 feet of road widening, 4,000 feet of road pioneering including tree and stump removal, laying road fabric, putting in base rock and 3/4 minus for final grade, turnouts were installed every 400 feet, and culverts were installed where it was necessary.
These are from some of the smaller projects we’ve done, from mulching jobs to field mowing, and small-scale clearing.
These are from some of the smaller projects we’ve done, from mulching jobs to field mowing, and small-scale clearing.
The Oak Savanah restoration projects range in size from 10 acres to hundreds of acres. The scope of work for these includes forestry mulching, slash piling, and brush cutting.
The Marion Forks Investment project is a service agreement we have for a timber investment company where we are in charge of slash piling, road building/pioneering, road maintenance, snow removal, and whatever else may come up.
The Cordon Road site was 22 acres and consisted of removing approximately 700 stumps, slash piling, grinding all stumps/slash, field mowing, and covering the area with woodchips from the grinding operations.